Project Neptune is a planned multi-phase energy infrastructure development comprising oil storage terminals, refinery facilities, and deep-water port-linked logistics at POIC Lahad Datu, Sabah.

Executive Snapshot

Public project facts for institutional review

Project Neptune is presented as a planned integrated oil storage terminal, refinery, and deep-water port-linked infrastructure development at POIC Lahad Datu, Sabah, Malaysia.

Project Platform

Integrated energy infrastructure at POIC Lahad Datu

Planned storage, deep-water marine access, terminal support infrastructure, and proposed downstream integration are presented as one phased development framework.

Phase 1 Capacity 1.9M m³

Planned oil storage capacity for the initial terminal stage.

Land Framework 110 / 400 acres

Approximately 110 acres for Phase 1 within a 400-acre total planned land framework.

Marine Access 20m / VLCC

Project materials reference 20m water depth and VLCC berth capability.

Schedule End 2026 → Jun 2028

Planned to commence at the end of 2026 and targeted for completion by June 2028, approximately 18 months.

Infrastructure Logic

A port-linked platform from storage to future downstream integration

The public project narrative is organised around location, storage capacity, marine access, terminal support systems, and proposed future refinery integration.

Project Overview →
01

POIC Lahad Datu

Industrial and port-linked project setting in Sabah, Malaysia.

02

Storage Terminal

Phase 1 planned oil storage capacity and tank-farm support infrastructure.

03

Marine Interface

Deep-water access and VLCC berth capability referenced in project materials.

04

Future Integration

Proposed downstream refinery integration aligned with terminal operations.

Project Neptune location map
Location

Strategic location at POIC Lahad Datu

The location information separates existing POIC Lahad Datu context from planned Project Neptune scope, with map-led orientation for Sabah, marine access, industrial land, and port-linked logistics.

Location →
Project Roadmap

Phased development framework

Project Neptune is planned to commence at the end of 2026, targeted for completion by June 2028, with an approximately 18-month development duration.

Schedule End 2026 to June 2028

Timing is presented as a planned and targeted schedule for stakeholder orientation, not as a completion guarantee.

Phase One

Initial terminal platform

Planned 1.9 million m³ storage capacity, approximately 110 acres, 20m water depth, and VLCC berth capability.

Phase Two

Storage expansion

Future expansion across the wider planned land framework, including reserved land for additional capacity and terminal growth.

Phase Three

Downstream integration

Proposed refining integration and downstream infrastructure aligned with the storage and marine platform.

Stakeholders

Stakeholder platform

The Stakeholders section covers the SOFOS platform, TS Asia Green Infrastructure, referenced collaboration partners, technical participants, and official commercial enquiry channels.

View Stakeholders
1

Project platform

SOFOS, SOFOS Capital Management, TS Asia Green Infrastructure, and the Project Neptune development framework.

2

Technical scope

Storage, tank configuration, port-linked marine interface, support facilities, and proposed downstream integration.

3

Location logic

POIC Lahad Datu, Sabah, regional positioning, deep-water context, and logistics orientation.

4

Official enquiries

Regional contact routes and authorised information channels for stakeholders and counterparties.

Official Channels

Discuss Project Neptune through the official contact channel

For project, partnership, media, or institutional enquiries, contact the project team through the listed official route.

Contact Us