Initial terminal foundation
Phase One is framed as the operating base for storage, marine receipt, terminal support, and safe product movement within the port-linked project setting.
Phase One is planned around an initial oil storage terminal, deep-water marine interface, and supporting terminal infrastructure at POIC Lahad Datu.
Phase One is planned around an initial oil storage terminal, deep-water marine interface, and supporting terminal infrastructure at POIC Lahad Datu.
| Planned storage capacity | 1.9 million m³ |
|---|---|
| Site area | Approximately 110 acres / 464,689.187 m² |
| Water depth | 20m |
| Marine capability | VLCC berth capability |
| Proposed berth configuration | 300,000 tonne berth, 50,000 tonne berth, and tugboat berth referenced in project materials |
Phase One is framed as the operating base for storage, marine receipt, terminal support, and safe product movement within the port-linked project setting.
Crude and diesel tank sets are presented as planned facilities within the initial terminal scope.
Project materials reference 20m water depth, VLCC berth capability, and proposed berth configuration.
Support facilities include office, fire station, power distribution, safety, laboratory, utilities, storage, and maintenance buildings.
Planned to commence at the end of 2026 and targeted for completion by June 2028, approximately 18 months.
Proposed crude oil tank set: 10 × 150,000 m³ floating-roof tanks and 4 × 50,000 m³ floating-roof tanks.
Proposed diesel tank set: 4 × 50,000 m³ floating-roof tanks.
Office building, fire station, power distribution, fire safety systems, sewage treatment, laboratory, utilities, material storage, and maintenance buildings.
Large vessels receive oil and smaller vessels distribute products through the planned port-linked terminal framework.
Phase One is planned around an initial oil storage terminal, deep-water marine interface, and supporting terminal infrastructure at POIC Lahad Datu.